« Courage | Main | Office 2007 Deployment »

August 14, 2007

Wiring Cleanup

Patch panels are supposed to be nice and neat and organized, right?  In other words, NOT like this:
Patchbefore

Well, David and Richard, perhaps with some other help, did a little rearranging.  WhatchaThink?
Patchafter

Of course, there is a little more cleanup needed:
Aftermath

TrackBack

TrackBack URL for this entry:
http://www.typepad.com/services/trackback/6a00d8341c6ade53ef00e54ede9ed88834

Listed below are links to weblogs that reference Wiring Cleanup:

Comments

Feed You can follow this conversation by subscribing to the comment feed for this post.

are those new green cables hand made or pre-made?

'tis nice

=> Jason. I'm sure they're hand made, but not by us :-) There's a cable supply company just down the street from us, Cable Depot (http://www.cabledepot.com) who will custom build just about anything if they don't already have it in stock. We used 6", 9", and 1' cables for the rework. They made the 6" for $2.30 each and 9" ones for $2.50 each. (The pre-made 1' cables were under $2, but I don't remember the exact price)

I want the leftovers.

Lookin' good Tony! I'm half tempted to tear out our 2U wire management units and go buy some 1-foot cables. ;-)

Here's another vendor for wiring (and other) needs -- located in California:
www.pimfg.com

The comments to this entry are closed.

Feed/Search/utm

  • Google


Your email address:


Powered by FeedBlitz

Blog powered by TypePad
Member since 07/2005

Powered by FeedBurner